Monday, September 7, 2009

Work in Progress 1

Venue : Mechatronics Workshop, E1, Kuliyyah of Engineering
Day/ Date : Friday / 4th September 2009


Preparing the prototype:

- Material: Prospects (thickness: 5 mm)

- Measure the dimensions of the prototype (building).

- Cut the prospect by using cutter.

- Put the pieces together and construct a building.


Figure 1: Work in progress by Liyana and Azlyn




Figure 2: The Building (70% in progress)
Posted by Picasa

No comments: